Institute of Hydro-Engineering
of Polish Academy of Sciences

Field surveys 2011

During field surveys planned in 2011, parameters of waves and currents, as well as changes of shoreline position, will be measured. The key part of the measurements will commence in September 2011.

Already in May, however, the buoy recording wave motion will be anchored at the depth of about 15 m, at a distance of ca. 1 NM from the shoreline

Contact:

  ul. Kościerska 7, 80–328 Gdańsk, POLSKA

   (+48)58-552-3903, fax (+48)58-552-4211

  sekr@ibwpan.gda.pl

Employee zone:

Copyright © 2018, IBW PAN w Gdańsku